Number and size
Count each patch and record approximate length, width and depth. Several distant patches may require different handling than one grouped repair area.
Defined patches, clear scope
A pothole is visible at the surface, but the amount of work is controlled by the sound repair boundary, depth, loose material, base condition and number of separate patches across the property.
Define the work first
Man Power Paving Ltd. scopes pothole and patching work for Edmonton homeowners and property managers. Instead of treating every hole as identical, the quote records patch count, dimensions and field conditions. Multiple small patches can sometimes share mobilization and equipment, but each repair still needs a defensible boundary and enough access for placement and compaction.
Before approval
These conditions are recorded during estimating or confirmed at the site so the written scope reflects the actual property.
Count each patch and record approximate length, width and depth. Several distant patches may require different handling than one grouped repair area.
The visible opening may be smaller than the weakened pavement around it. Final boundaries are confirmed against material that can support a durable tie-in.
Standing water, pumping fines, soft aggregate or recurring settlement can indicate a condition beneath the asphalt that should not be ignored.
Occupied parking lots and access lanes may need a work window, vehicle relocation, cones or other controls before the repair area can be opened safely.
Practical preparation
Photograph the patch from more than one angle and include a common object or measurement for scale. Note whether the surface is dry, wet, loose or actively moving under traffic.
For several patches, list them separately or provide a marked property sketch. This reduces missed areas and helps determine whether work can be grouped into one efficient visit.
The written scope should explain whether the work is a temporary surface treatment or a defined removal-and-replacement patch. Those are different outcomes and should not be described as though they are interchangeable.
Common questions
Yes. Shared travel, setup and equipment may affect the combined job, but each patch still needs to be counted and measured so the total scope remains clear.
Not necessarily. Loose surrounding asphalt or an unstable base can make the required repair larger than the opening that is visible at first glance.
The repair area and a safe working path normally need to be available. For occupied properties, access and traffic arrangements should be confirmed before scheduling.
Next step
Use the detailed estimator when the work is measurable. Contact Sales when access, drainage, base condition or the correct repair path still needs to be confirmed.